Signs have been posted around the downtown to let people know that demolition of the Virginia Street Bridge was about to start. On May 26, the sign in front of the Reno Arch (left) was removed and the date on all the remaining signs was changed to June 6.
Signs have been posted around the downtown to let people know that demolition of the Virginia Street Bridge was about to start. On May 26, the sign in front of the Reno Arch (left) was removed and the date on all the remaining signs was changed to June 6.

Leave a comment

Your email address will not be published. Required fields are marked *